Blogs
Blogs
400G to 800G Migration Playbook: A Four-Phase Approach for Production AI Fabrics
Moving from 400G to 800G doesn't require a forklift upgrade. This playbook covers a four-phase approach — audit, spine upgrade with breakout, leaf migration, and full 800G fabric — that keeps production AI workloads running throughout the transition and leaves your fiber plant 1.6T-ready.
Read more
Talk to an Optical Engineer
Get engineering answers before you commit
Share your BOM, validate compatibility, or sanity-check 400G/800G designs. Get fast, practical guidance from US-based fiber optics engineers.


